New Bottle Mineral Water Filling Factory and Soda Water Filler

New Bottle Mineral Water Filling Factory and Soda Water Filler

New Bottle Mineral Drinking water Filling Factory and Soda Water Filler

 

Bottle Washing Component

 CZPT cramps are utilized in the bottle washing approach. The empty bottles can be turned more than 180° Alongside the conveying rail. There are two instances of interior and external washing, the performance of bottle washing is large.

Rinsing equipment adopts overturn and double-opened bottle clip. Bottle clip lock the bottleneck, the materials of bottle clip is SUS304, which is hygienic and durable.

Bottle clip outfitted with productive spray on nozzle. The extrusive droplet with 15° Angle assures to wash all facet of the bottle, and can preserve the drinking water.

Manufactured of stainless metal of excellent high quality.
Equipped with bottle jam protection unit.
 

Bottle Filling Element

 The design and style of filling structure is sensible and hygiene dead angle, the operate of products is stable, it can management the materials from the bottleneck, the handle accuracy is inside of ± 2mm (topic to bottle layout). The filling valve materials is SUS304. The filling system has liquid degree computerized handle. Filling valve raise is managed by the valve elevator, soon after filling valve contact the bottleneck, it start to fill. Bottle is conveying by the wheel in the filling portion.

Bottle Capping Component


 

Screw capping machine is most precision component in the 3-one machine, it has a large affect to the merchandise stability and faulty charge. 

  Applicable products: Pure drinking water, mineral h2o ,etc. (300ml-2000ml)

           Applicable  containers: PET bottles, glass bottles, metal cans, pull ring cans and PP bottles.

           Filling theory : Gravity filling, flowmeter filling, weighing filling 

           Filling temperature : Room temperature

           Production capacity : 3000BPH – 36000BPH 
 

Description:

This product is a variety of 3-in-1 device h2o filling machinery for creating potable ingesting drinking water like pure h2o, mineral drinking water etc.The system incorporates rinsing, filling and capping into one and is a sort of entire-automated equipment. It is ideal for creating PET and plastic bottled mineral h2o and purified h2o. The approach of filling adopts gravity or micro-pressure filling which helps make the filling velocity faster and a lot more stable. Therefore, compared with similar goods, this unit has characteristics of increased output and bigger positive aspects. The tools is fitted with advanced Mitsubishi programmable PLC to management the operation and cooperated by frequency converter of the main motor it tends to make the operation a lot more secure and trustworthy. The photoelectric sensor is employed to detect operating situations of every single part, which can make the operation of this tools very computerized and handy.

CZPT Characteristics:

1. Immediate relationship technologies is adopted among air conveyor and bottle-feeding star wheel, and there is no bottle feeding screw and conveying chain. It is fairly simple to alter the bottle condition.

2. Bottleneck-maintain engineering is adopted for bottle conveying. Although changing the bottle form, consumers only require to substitute the arc manual plate, star wheel and other nylon areas that are pertinent to the bottle diameter.

3. The three in one unit equipment incorporates rinsing, filling, and capping into one particular, hence generating bottle dress in charge reduce, conveying accurate and steady, changing bottle condition far more convenient.

four. The specially designed bottle gripper of rinser is made of entirely stainless steel,so it is sturdy and firm. Besides, it will not get in touch with with the screw areas of bottleneck, thus staying away from the secondary contamination.

5. The device is made with high-speed mass circulation isobar filling valve to make sure the high filling velocity and precise liquid level CZPT any decline. 

six.Elements contacting with liquid are all created of higher-good quality stainless metal and meals-grade engineering plastic, and most electrical programs adopt imported components that fulfill our condition foodstuff hygienic expectations.

7. Bottle-outputting star wheel and bottle-base supporting plate adopt spiral winding technique, and there is no require to modify the peak of bottle conveying chain even though modifying the bottle form.

Major Versions:

Model

Output

XGF14-12-5

5000BPH (500ml)

XGF16-sixteen-five

7000BPH (500ml)

XGF24-24-6

10000BPH (500ml)

XGF32-32-8

15000BPH (500ml)

XGF40-40-ten

18000BPH (500ml)

XGF50-50-twelve

22000BPH (500ml)

XGF72-seventy two-eighteen

30000BPH (500ml)

XGF84-eighty four-20

36000BPH (500ml)

Major items

1. Mineral Drinking water/ Pure Water Filling Creation Line
2. Carbonated Consume Filling Production Line
3. Juice(with pulp)/ Tea Consume Filling Generation Line
four. H2o treatment method, Bottle Unscrambler, Sterlizer and all types of auxiliary products.
Profession in managing all type of beverage line turnkey project!
5. Semi-auotomatic/ Complete-computerized PET Bottle Blowing Equipment
6. three-five Gallon Barrel Drinking water Filling Generation Line 

Firm data

Pre-sales  Q&A 
one.Are you a trading firm or a manufacturer?
We are a manufacturer with more than fifteen a long time expertise source the manufacturing facility price tag machine with good quality, welcome to check out !

two.Do you have reference task?
We have reference undertaking in most nations around the world,If we get the permission of the client who has introduced the machines from us ,we can inform you their make contact with imformation,you can go to vist their manufacturing facility.
And you are often welcome to arrive to visit our company,and see the machine managing in our manufacturing facility,we can choose you up from the station in close proximity to our metropolis.
Contact our revenue folks you can get online video of our reference managing device

3.Do you have agent and after-support stations?
So considerably we have agent in Yemen,Nigeria,Dubai,India,Kenya,Dubai welcome to sign up for us!

4.Do you have any certificate
we have been certificated by the renowned cercification authority http:///Certificates.html

5.Do you offer turnkey undertaking

Turnkey undertaking CZPT We can assist you to begin a new company in beverage producing.Pls contact with our sales people

6.Do you offer CZPT service
we can layout the machines in accordance your requirements(materil ,energy,filling kind,the varieties of the bottles,and so on),at the very same time we will give you our professional suggestion,as you know,we have been in this business for many a long time.

7.What is your promise or the warranty of the high quality if we purchase your devices?
We provide you higher top quality machines with 1 year assure and provide existence-prolonged complex assistance.

Sale Q&A
1.What is actually your payment term?
We accept thirty% deposit 70%TT before shipment by TT/LC/Western union 

two.What is your shipping phrase?
We offer EXW,FOB,CFR,CIF delivery terms

3.How to check equipment just before shipping and delivery?
Devices tests operating more than 8 hours, and sending tests video clips.

four.How about the Packaging details?
CZPT export packing, key goods making use of export plywood circumstance packing, modest merchandise use thick carton packing, make certain that the solution packaging integrity and protection

Right after revenue Q&A
one.When can I get my device after I paid?
Typically production time is close to 30-60days,the exactly count on what kind of device you get.The transport time is based mostly on your spot port.

2.How to install my equipment when it comes?how much the expense?
We will deliver our engineers to your manufacturing unit to set up the machines and prepare your employees how to run the devices. CZPTer shell out spherical airtickets,engineer visa price,accommodation and engineer income USD100/day/individual.

three.When can i get engineers from you?
When you complete the Preparation problems(water useful resource,electricity,air provide,manufacturing resources)contact with our income people we will dispatch engineer to set up the equipment for you ,and train your personnel to use the device well.Generally when you preparing is carried out,you speak to with our income individuals and cooperate us to get the visa for the engineer and our engineer will be here inside of fifteen times.

4.How prolonged time for installation?
In accordance your machines get,we will ship 1 or two engineers to your plant,it will get about ten days to 25 times.

5.How about the spare components?
We will ship one year sufficient simple broken spare parts together with the machines,delivery with each other.For the duration of the warranty time,we will provide the spare areas with our value like the shipping and delivery expenses.

for more a lot more wants and inquiry pls speak to with Miss

 

Get in touch with us

 

New Bottle Mineral Water Filling Factory and Soda Water Filler

Tags