Rock Corrugated Sidewall Belt CZPT of Mineral Processing Plant
Operating Theory
The equipment is short for “sidewall machine” or “large inclination angle belt conveyor”, with the positive aspects of easy framework, reputable operation, and practical maintenance of general conveyor, and the attributes of large inclination angle conveying, compact composition, less land occupation, is the perfect tools for higher inclination angle conveying (even for vertical conveying).
Characteristics
The greatest inclination angle can be up to 90°, it is the perfect gear of the higher inclination angle conveying and vertical lifting, which saves land profession, gear expenditure and design value, thus obtain a very good complete economic reward.
Structure is basic, all main elements are CZPT for standard belt conveyor, which is convenient for procedure and upkeep.
CZPT operation, no chain-block, chain-floating, chain-scission phenomena of buried scraper conveyor and skid, bucket-off phenomena of bucket elevator.
Steady operation and minimal noise.
As there is no digging resistance of loading, the interior&exterior friction and the energy usage is low.
Horizontal conveying area of any duration can be set at the begin and conclude portion of vertical sidewall device, which is practical for the connection with other equipment.
Application Scope
Corrugated sidewall belt conveyor is one of the most commonly utilised mining equipment, which is extensively used in mineral processing, construction supplies, silicate and chemical industries. In the manufacturing of small scale, medium scale or massive scale mineral processing Plants, it is normally used as the tranportation machine tfor steel ores of gold, silver, copper, guide, zinc, nickel, manganese, iron, molybdenum , chromium, tin and other individuals, as well as stone, rock, granite, limestone, barite, quartz, graphite, feldspar, fluorspar, coal, and so forth.
Conveying capability Qv below different parameters whilst belt speed is 1m/s
Modest Measurement
Belt Width (mm) |
five hundred | 650 | |||||||||||||
Sidewall Peak (mm) |
eighty | a hundred and twenty | one hundred sixty | 80 | one hundred twenty | 160 | |||||||||
Compartment Distance (mm) |
126 | 252 | 126 | 252 | 378 | 252 | 378 | 126 | 252 | 126 | 252 | 378 | 252 | 378 | |
Elevation Angle | 30° | 39 | 21 | – | 52 | 34 | 65 | forty five | fifty nine | 32 | – | 78 | fifty two | a hundred and five | seventy three |
40° | 31 | sixteen | – | 40 | 26 | fifty two | 34 | forty seven | 24 | – | 60 | forty | 85 | fifty six | |
50° | twenty five | 13 | 60 | 32 | – | forty two | 27 | 37 | 19 | ninety | 48 | – | sixty eight | forty five | |
60° | twenty | 11 | 50 | 26 | – | 34 | 23 | 31 | sixteen | 75 | 39 | – | fifty five | 36 | |
70° | seventeen | – | forty one | 21 | – | 28 | 18 | 25 | – | 62 | 32 | – | 45 | 30 | |
90° | 10 | – | twenty five | – | – | 17 | – | fifteen | – | 38 | – | – | 28 | – |
Large Dimensions
Belt Width (mm) |
800 | one thousand | |||||||||||||||
Sidewall Top (mm) |
a hundred and twenty | 160 | 200 | a hundred and sixty | two hundred | 240 | |||||||||||
Compartment Distance (mm) |
126 | 252 | 378 | 252 | 378 | 252 | 378 | 504 | 252 | 378 | 252 | 378 | 504 | 252 | 378 | 504 | |
Elevation Angle | 30° | – | ninety nine | sixty five | 136 | ninety four | – | 148 | 113 | 186 | 129 | – | 207 | 159 | – | 283 | 229 |
40° | – | seventy six | fifty | 110 | seventy two | – | 114 | 87 | a hundred and fifty | 99 | – | 160 | 122 | – | 231 | 176 | |
50° | 113 | sixty | – | 88 | fifty eight | 139 | ninety one | – | a hundred and twenty | seventy nine | 195 | 128 | – | – | 185 | 141 | |
60° | 95 | 49 | – | seventy two | 47 | 113 | seventy four | – | ninety eight | sixty four | 159 | a hundred and five | – | 229 | 151 | – | |
70° | seventy seven | forty | – | fifty eight | 38 | 92 | sixty one | – | eighty | 52 | one hundred thirty | eighty five | – | 187 | 123 | – | |
90° | 47 | – | – | 36 | – | 57 | 37 | – | forty nine | – | eighty | fifty two | – | one hundred fifteen | seventy six | – |
Allowable Max. Particle Dimension and Max. Velocity with Distinct Belt Widths, Guard Facet
Small Dimension
Belt Width (mm) |
500 | 650 | ||||||
Sidewall Height (mm) |
eighty | 120 | 160 | 80 | 120 | a hundred and sixty | ||
Elevation Angle
|
30° | Max. Belt Speed (m/s) | two | two | two | 1.6 | 2 | two |
Max. Particle Dimension (mm) | 100 | a hundred and twenty | one hundred twenty | 100 | one hundred forty | a hundred and sixty | ||
40° | Max. Belt Velocity (m/s) | two | 2 | 2 | 1.six | two | two | |
Max. Particle Dimensions (mm) | a hundred | one hundred twenty | a hundred and twenty | one hundred | a hundred and forty | 160 | ||
50° | Max. Belt Velocity (m/s) | 1.6 | one.six | one.6 | 1.six | 1.6 | one.6 | |
Max. Particle Measurement (mm) | eighty | one hundred twenty | one hundred forty | 80 | 120 | one hundred forty | ||
60° | Max. Belt Speed (m/s) | one.6 | one.6 | one.six | one.six | 1.6 | one.six | |
Max. Particle Size (mm) | 80 | a hundred and twenty | a hundred and forty | eighty | a hundred and twenty | 140 | ||
70° | Max. Belt Velocity (m/s) | one.25 | 1.25 | one.twenty five | one.twenty five | one.25 | one.25 | |
Max. Particle Dimensions (mm) | fifty | sixty | 100 | fifty | 60 | one hundred | ||
90° | Max. Belt Pace (m/s) | one. | 1. | one. | one.25 | 1.twenty five | 1.25 | |
Max. Particle Dimensions (mm) | 50 | 60 | eighty | fifty | 60 | 80 |
Large Measurement
Belt Width (mm) |
800 | a thousand | ||||||
Sidewall Height (mm) |
one hundred twenty | 160 | two hundred | a hundred and sixty | 200 | 240 | ||
Elevation Angle
|
30° | Max. Belt Pace (m/s) | 2 | two.5 | 2.five | two.five | 2.five | 2.5 |
Max. Particle Measurement (mm) | a hundred and forty | one hundred eighty | two hundred | one hundred eighty | 250 | 280 | ||
40° | Max. Belt Velocity (m/s) | 2 | two | 2 | 2 | two | two.5 | |
Max. Particle Measurement (mm) | 140 | one hundred eighty | two hundred | one hundred eighty | 250 | 250 | ||
50° | Max. Belt Velocity (m/s) | one.6 | one.six | 1.six | 1.6 | 1.six | 2 | |
Max. Particle Dimensions (mm) | 120 | a hundred and forty | 180 | a hundred and forty | a hundred and eighty | 220 | ||
60° | Max. Belt Speed (m/s) | one.six | 1.six | 1.6 | one.6 | 1.six | one.6 | |
Max. Particle Size (mm) | a hundred and twenty | a hundred and forty | a hundred and eighty | a hundred and forty | a hundred and eighty | 220 | ||
70° | Max. Belt Velocity (m/s) | one.6 | one.six | 1.6 | one.six | 1.six | 1.6 | |
Max. Particle Size (mm) | one hundred twenty | 100 | a hundred and forty | one hundred | 140 | 180 | ||
90° | Max. Belt Pace (m/s) | one.twenty five | 1.25 | 1.twenty five | one.25 | one.twenty five | 1.twenty five | |
Max. Particle Dimensions (mm) | sixty | 80 | a hundred | 80 | one hundred | 140 |
one. What is the primary enterprise scope of your business?
HZE is a firm with R&D center, design and style institute, producing factories, installation and commissioning teams. Our buyers are in the mining and mineral processing fields. Our major organizations contain mineral processing EPC (engineering, procurement and design), task session, engineering style, mineral processing tools producing, on-website installation, commissioning, personnel instruction, consumer task procedure administration, spare components supply and complex assist. CZPTers are totally free to select any one or any mixture of our services.
two. What are the exceptional benefits of your business?
The one particular-cease provider of mineral processing engineering venture and tools is our core competitiveness.
The most important characteristic that HZE distinguishes itself from other engineering organizations, style organizations or consulting organizations is that we are also an equipment producer with a production plant of 50,000 sq. meters, and we have complete manufacturing rout and the connected gear.
HZE distinguishes itself from other tools makers by owning its personal R&D centre and engineering layout institute.
HZE distinguishes itself from a lot of mining machinery enterprises by possessing an skilled group with users such as not only senior engineers of the business, but also leading Chinese technical authorities, college professors and scientists.
3. What are the characteristics of your company’s 3D style?
HZE not only employs 3D software program to design and style equipment, but also uses 3D application to design process movement, pipeline, metal structure, auxiliary amenities, and so forth. of the whole mineral processing project. We even use 3D style for equipment packaging, container packing and equipment instructions guide. This tremendously improves the high quality of products and engineering, shortens the development period of time, facilitates complex discussion and analysis, facilitates venture management, increases design protection and lowers venture expense.
four. What are the support characteristics of your firm?
- CZPTers who regardless of whether get our tools, or entrust us with EPC, or require us to supply a specific support, cooperate carefully with us to have out distinct functions and supervise our implementation during the procedure.
- HZE will consider to recognize the fundamental predicament and demands of clients as detailed as feasible ahead of the sale, formulate a preliminary strategy according to the distinct circumstance of consumers, and get unanimous opinions soon after communications and discussions with customers to establish the prepare.
- We set up consumer data files for each and every buyer who signed the contract with us and add them to the Cloud in which clients can also get an account and password. CZPTers can have all the paperwork, videos and pictures, technologies, solutions, execution, operation, management and control, servicing and so on relevant to the enterprise.
- Whether or not it is in the procedure of basic contracting, equipment producing or supplying some sort of support, we welcome consumers to know about our implementation on the place or through the network, and put CZPT needs and views.
- We assist consumers who have used our items to formulate operation specs and make suggestions on routine maintenance ideas and spare parts inventories. In addition to program on-website set up, commissioning and training, for the duration of the manufacturing period of time following we handing above gear to clients for use, we typically realize the tools using scenarios through the network and offer guidance and education to buyer administration and operators.
- For the clients who have just begin the mining company, we offer the possibility of training and follow in China’s mines for the clients’ personnel, until they are expert in operation and upkeep.